UP

The runway of Fuzuli airport will be 3 km

Home page Society
12 Punto 14 Punto 16 Punto 18 Punto

The length of the newly built airport in Fuzuli will be 3,000 meters.

Axar.az reports that the statement came from Shaig Gojayev, a representative of the company carrying out construction work at Fuzuli airport.

The representative said that the runway of Fuzuli airport will be 3,000 meters long and 60 meters wide. At present, the soil layer is removed and replaced with natural gravel.

Then the asphalt cover will be laid Shaig Gojayev a large number of equipment and manpower were brought to the area to complete the construction work on time.

Date
2021.02.28 / 19:12
Author
Nurlana Ahmadova
See also

Kazakh servicemen to participate in "Tarlan - 2025" exercise

Weather forecast for July 6

Sharif farewelled with honor guard at Fuzuli Airport

Sharif: ECO summit strengthens Pakistan-Azerbaijan ties

Erdogan: Turkiye always stands by Azerbaijan

Pezeshkian farewelled by honor guard at Fuzuli Airport

Tajik President farewelled with honor guard at Fuzuli Airport

Aliyev hosts ECO Summit heads at official Shusha dinner

Erdogan farewelled with guard of honor at Fuzuli Airport

Uzbek president Mirziyoyev bids farewell at Fuzuli Airport

Latest
Xocalı soyqırımı — 1992-ci il Bağla
Bize yazin Bağla
ArxivBağla