UP

An alternative way to the Lachin corridor - Armenian MP

Home page World
12 Punto 14 Punto 16 Punto 18 Punto

The construction of the alternative road to the Lachin corridor will be completed in the spring. The construction has started, the equipment is working, and the road is being built.

Axar.az reports with reference to the Report.az that this was stated by the Minister of Territorial Administration and Infrastructure of Armenia, Gnel Sanosyan.

"We have divided it into three parts and we are actively working on it," he added.

It should be noted that Armenian armed groups occupied Lachi on May 18, 1992. As a result of the Patriotic War that started on September 27, 2020, and lasted for 44 days, several villages of Lachin were freed from occupation.

According to the statement signed by President of Azerbaijan Ilham Aliyev, President of Russia Vladimir Putin, and Prime Minister of Armenia Nikol Pashinyan on November 10, 2020, Lachin was returned to Azerbaijan on December 1. However, the city of Lachin and several settlements fell into the corridor, so it remained under the temporary control of Russian peacekeepers.

Date
2022.08.04 / 14:39
Author
Zuleykha Aghasieva
Comments
See also

The Iranian general is alive and lives in the US

In this case, we will lay down the weapon - Hamas

Peru arrests IRGC member

Tokayev: They are trying to impose their agenda on us

The Czech defence team is in the MOD of Armenia

The call for military service begins in Armenia

Operation in Turkiye: 9 Kurdish journalists were arrested

Day 792: Russian losses updated

The US destroyed 4 Houthi drones

Putin has a plan, he is filling the warehouses - Pistorius

Latest
Xocalı soyqırımı — 1992-ci il Bağla
Bize yazin Bağla
ArxivBağla