UP

Kazakhstan increases capacity of its major oil pipeline

Home page World
12 Punto 14 Punto 16 Punto 18 Punto
Kazakhstan increases capacity of its major oil pipeline

Kazakhstan completed the overhaul of its section of Tuimazy-Omsk-Novosibirsk-2 (TON-2) oil pipeline which allowed to increase its capacity from 7 to 10 million tons of oil per year, KazTransOil company reported.

The pipeline section 185.6 km long was replaced within the overhaul work.

The overhaul of TON-2 was conducted to ensure the reliable oil transportation through Kazakhstani section of TON-2 pipeline to Pavlodar Petrochemical Plant and Russian oil transit to China.

The project cost over 32 billion tenges (341.06 tenge = $1).

Date
2016.09.04 / 15:59
Author
Axar.az
See also

Norway, Ukraine to expand joint air defence cooperation

Zelensky, Magyar discuss expanding bilateral ties

Turkish helicopter crash claims five lives - Video

Zelensky: Ukraine needs at least €115 billion next year

Former Turkish parliament speaker Cetin dies at 89

A 4.6-magnitude earthquake strikes Turkiye’s Mugla province

Ukrainian military losses updated on 1,735th day of war

Russia yet to see benefit of European role in Ukraine talks

IDF eliminates senior Hamas security official in Gaza

Turkiye ready to host US-Iran talks

Latest
Xocalı soyqırımı — 1992-ci il Bağla
Bize yazin Bağla
ArxivBağla