UP

Kazakhstan increases capacity of its major oil pipeline

Home page World
12 Punto 14 Punto 16 Punto 18 Punto

Kazakhstan completed the overhaul of its section of Tuimazy-Omsk-Novosibirsk-2 (TON-2) oil pipeline which allowed to increase its capacity from 7 to 10 million tons of oil per year, KazTransOil company reported.

The pipeline section 185.6 km long was replaced within the overhaul work.

The overhaul of TON-2 was conducted to ensure the reliable oil transportation through Kazakhstani section of TON-2 pipeline to Pavlodar Petrochemical Plant and Russian oil transit to China.

The project cost over 32 billion tenges (341.06 tenge = $1).

Date
2016.09.04 / 15:59
Author
Axar.az
See also

Polish security neutralizes drone over government buildings

Arab, Islamic countries back Qatar over Israeli strike

UN Chief to meet US President Trump at UNGA

High demand for China trips as visa-free regime starts

NATO launches operation Eastern watch on Eastern Flank

Sisi: Arab States form one region from the ocean to Gulf

Erdogan congratulates Azerbaijan

Erdogan arrives in Qatar for Arab-Islamic summit

Netanyahu calls Israel critics over Qatar attack 'hypocrites'

Russia reports updated Ukrainian losses on Day 1300

Latest
Xocalı soyqırımı — 1992-ci il Bağla
Bize yazin Bağla
ArxivBağla