UP

Images from Fuzuli - Shusha highway - Photo

Home page Gallery
12 Punto 14 Punto 16 Punto 18 Punto

Media representatives got acquainted with the works being carried out on the Ahmedbeyli-Fuzuli-Shusha highway.

Axar.az reports that media representatives visited the first tunnel inaugurated by President Ilham Aliyev a few days ago.

Eyyub Huseynov, the Karabakh project engineer of the State Agency of Azerbaijan Highways, said that the construction of the Ahmedbeyli-Fuzuli-Shusha highway is continuing rapidly. The total length of this road is 81.7 kilometers, which is 19.3 km shorter than Zafar road:

"The first technical grade road has 4-6 traffic lanes. Along the way, 194 culverts of different diameters, 38 underground passages, 11 bridges, 7 tunnels and 9 viaducts are being built. The total length of bridges is 1,557 meters, the length of viaducts is 1,965 meters, and the total length of tunnels is about 6,450 meters in one direction.

We present images of the works carried out on the Ahmedbeyli-Fuzuli-Shusha highway:

Date
2024.05.14 / 19:11
Author
Axar.az
Comments
See also

Our flag flies over Arazdayan - Photo

Unity sharing from the MoD of Turkiye - Photo

The President shared about the National Press Day - Photo

A network embezzled 3m dollars from Ukrainian army - Photo

Ear patch is Republicans’ New Fashion Statement - Photo

Marks worn by Armenians in training with the US army - Photo

A habitable cave was found on the moon - Photo

Pashinyan went on a bike ride in Berlin - Photo

Our soldiers are 50 meters from the Kirants fence

Half-naked people on the streets of Yerevan - Photo

Latest
Xocalı soyqırımı — 1992-ci il Bağla
Bize yazin Bağla
ArxivBağla